G743CW-2024

Continuation Sheet for Cost of the Work Design-Build Projects

$49.99

One time use

Quantity

AIA Documents G742™CW–2024, Application and Certificate for Payment for Cost of the Work Design-Build Projects without a Guaranteed Maximum Price; G742™GMP–2024, Application and Certificate for Payment for Cost of the Work Design-Build Projects with a Guaranteed Maximum Price; and G743™CW–2024, Continuation Sheet for Cost of the Work Design-Build Projects are forms on which a design-builder can apply for payment, and the owner can certify payments are due, on a design-build project where the basis of payment to the design-builder is the cost of the work plus a fee. G742™GMP–2024 should be used on cost of the work design-build projects that have a guaranteed maximum price, while G742™CW–2024 should be used on cost of the work design-build projects that do not have a guaranteed maximum price.

When to use this document?

  • Any size project
  • Payment method: cost of the work plus a fee with OR without a Guaranteed Maximum Price (GMP)

Related Documents

Many of our customers use these similar documents to finish there project. Select individual documents below or add all to cart.


Standard Form of Consultant’s Services: Facility Condition Assessment

$149.99

Change Order for a Design-Build Project, Subcontractor Version

$49.99

BIM Exhibit for Sharing Models with Project Participants on a Design-Build Project

$149.99

Standard Form of Agreement Between Architect and Consultant for a Design-Build Project

$149.99

Change Order for a Design-Build Project

$49.99

Want to Save $1,000s?

Join the majority of professionals who rely on our contracts and forms across the project lifecycle. Upgrade to an Unlimited Subscription and gain unrestricted access to all 270+ templates.